Norway vs Thailand: Dealing with construction permits: Cost

Norway
0.6%
in 2019
Thailand
0.6%
in 2019
Norway rank
154th
Thailand rank
154th

Dealing with construction permits: Cost over time

  • Norway
  • Thailand
00.511.5200520122019

How they compare

Norway currently reports 0.6% against 0.6% in Thailand, a difference of 0.0%.

Across all 15 years both countries report, Thailand has been ahead every year.

Norway ranks 154th and Thailand ranks 154th of 188 countries.

Thailand has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Norway Thailand Difference Ahead
2000s 0.6% 1.3% 0.7% Thailand
2010s 0.5% 0.8% 0.3% Thailand

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Norway or Thailand?
Norway, at 0.6% against 0.6% in Thailand as of 2019.
What is the difference in dealing with construction permits: cost between Norway and Thailand?
0.0%, with Norway ahead.
How many years of comparable data are there for Norway and Thailand?
15 years are reported by both, from 2005 to 2019.
How do Norway and Thailand rank globally for dealing with construction permits: cost?
Norway ranks 154th and Thailand ranks 154th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Norway vs Thailand: Dealing with construction permits: Cost. Statizoid. Retrieved 29 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/norway/thailand/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/norway/thailand/">Norway vs Thailand: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.