Oman vs Samoa: Dealing with construction permits: Cost

Oman
0.8%
in 2019
Samoa
0.8%
in 2019
Oman rank
146th
Samoa rank
146th

Dealing with construction permits: Cost over time

  • Oman
  • Samoa
0.50.7511.21.51.8200520122019

How they compare

Oman currently reports 0.8% against 0.8% in Samoa, a difference of 0.0%.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Oman ahead.

Oman ranks 146th and Samoa ranks 146th of 187 countries.

Across the 2 decades both report, Oman averaged higher in 1 and Samoa in 1.

Head to head by decade

Decade Oman Samoa Difference Ahead
2000s 1.3% 0.7% 0.6% Oman
2010s 0.7% 0.8% 0.1% Samoa

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Oman or Samoa?
Oman, at 0.8% against 0.8% in Samoa as of 2019.
What is the difference in dealing with construction permits: cost between Oman and Samoa?
0.0%, with Oman ahead.
How many years of comparable data are there for Oman and Samoa?
15 years are reported by both, from 2005 to 2019.
How do Oman and Samoa rank globally for dealing with construction permits: cost?
Oman ranks 146th and Samoa ranks 146th of 187 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Oman vs Samoa: Dealing with construction permits: Cost. Statizoid. Retrieved 21 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/oman/samoa/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/oman/samoa/">Oman vs Samoa: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.