Panama vs Slovenia: Dealing with construction permits: Cost

Panama
2.5%
in 2019
Slovenia
2.7%
in 2019
Panama rank
93rd
Slovenia rank
91st

Dealing with construction permits: Cost over time

  • Panama
  • Slovenia
01234200520122019

How they compare

Slovenia currently reports 2.7% against 2.5% in Panama, a difference of 0.2%.

That makes Slovenia's figure about 1.1 times Panama's.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Panama ahead.

Panama ranks 93rd and Slovenia ranks 91st of 188 countries.

Across the 2 decades both report, Panama averaged higher in 1 and Slovenia in 1.

Head to head by decade

Decade Panama Slovenia Difference Ahead
2000s 3.1% 2.8% 0.4% Panama
2010s 2.6% 2.9% 0.4% Slovenia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Panama or Slovenia?
Slovenia, at 2.7% against 2.5% in Panama as of 2019.
What is the difference in dealing with construction permits: cost between Panama and Slovenia?
0.2%, with Slovenia ahead.
How many years of comparable data are there for Panama and Slovenia?
15 years are reported by both, from 2005 to 2019.
How do Panama and Slovenia rank globally for dealing with construction permits: cost?
Panama ranks 93rd and Slovenia ranks 91st of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Panama vs Slovenia: Dealing with construction permits: Cost. Statizoid. Retrieved 29 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/panama/slovenia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/panama/slovenia/">Panama vs Slovenia: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.