Samoa vs Switzerland: Dealing with construction permits: Cost

Samoa
0.8%
in 2019
Switzerland
0.7%
in 2019
Samoa rank
147th
Switzerland rank
150th

Dealing with construction permits: Cost over time

  • Samoa
  • Switzerland
00.20.40.60.81200520122019

How they compare

Samoa currently reports 0.8% against 0.7% in Switzerland, a difference of 0.1%.

That makes Samoa's figure about 1.1 times Switzerland's.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Switzerland ahead.

Samoa ranks 147th and Switzerland ranks 150th of 188 countries.

Across the 2 decades both report, Samoa averaged higher in 1 and Switzerland in 1.

Head to head by decade

Decade Samoa Switzerland Difference Ahead
2000s 0.7% 0.8% 0.1% Switzerland
2010s 0.8% 0.7% 0.0% Samoa

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Samoa or Switzerland?
Samoa, at 0.8% against 0.7% in Switzerland as of 2019.
What is the difference in dealing with construction permits: cost between Samoa and Switzerland?
0.1%, with Samoa ahead.
How many years of comparable data are there for Samoa and Switzerland?
15 years are reported by both, from 2005 to 2019.
How do Samoa and Switzerland rank globally for dealing with construction permits: cost?
Samoa ranks 147th and Switzerland ranks 150th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Samoa vs Switzerland: Dealing with construction permits: Cost. Statizoid. Retrieved 25 August 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/samoa/switzerland/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/samoa/switzerland/">Samoa vs Switzerland: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.