Sao Tome and Principe vs United Arab Emirates: Dealing with construction permits: Cost

Sao Tome and Principe
2.2%
in 2019
United Arab Emirates
2.2%
in 2019
Sao Tome and Principe rank
100th
United Arab Emirates rank
100th

Dealing with construction permits: Cost over time

  • Sao Tome and Principe
  • United Arab Emirates
1234200520122019

How they compare

Sao Tome and Principe currently reports 2.2% against 2.2% in United Arab Emirates, a difference of 0.0%.

The two have swapped places 3 times across 15 shared years of data; in 2005 it was Sao Tome and Principe ahead.

Sao Tome and Principe ranks 100th and United Arab Emirates ranks 100th of 188 countries.

Sao Tome and Principe has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Sao Tome and Principe United Arab Emirates Difference Ahead
2000s 2.9% 2.1% 0.8% Sao Tome and Principe
2010s 2.4% 2.2% 0.2% Sao Tome and Principe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: cost, Sao Tome and Principe or United Arab Emirates?
Sao Tome and Principe, at 2.2% against 2.2% in United Arab Emirates as of 2019.
What is the difference in dealing with construction permits: cost between Sao Tome and Principe and United Arab Emirates?
0.0%, with Sao Tome and Principe ahead.
How many years of comparable data are there for Sao Tome and Principe and United Arab Emirates?
15 years are reported by both, from 2005 to 2019.
How do Sao Tome and Principe and United Arab Emirates rank globally for dealing with construction permits: cost?
Sao Tome and Principe ranks 100th and United Arab Emirates ranks 100th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Cost (% of Warehouse value). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Sao Tome and Principe vs United Arab Emirates: Dealing with construction permits: Cost. Statizoid. Retrieved 12 September 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/sao-tome-and-principe/united-arab-emirates/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-cost-percent-of-warehouse-value/sao-tome-and-principe/united-arab-emirates/">Sao Tome and Principe vs United Arab Emirates: Dealing with construction permits: Cost</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Cost (% of Warehouse value)
Unit
% of Warehouse value
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The cost records all official costs associated with completing the procedures to legally build a warehouse, including the costs associated with obtaining land use approvals and preconstruction design clearances; receiving inspections before, during and after construction; obtaining utility connections; and registering the warehouse at the property registry. It is calculated as a percentage of the warehouse value. Nonrecurring taxes required for the completion of the warehouse project are also recorded. Sales taxes (such as value added tax) or capital gains taxes are not recorded. Nor are deposits that must be paid up front and are later refunded.