Albania vs Cameroon: Dealing with construction permits (DB06-15 methodology) - Score

Albania
44.54
in 2014
Cameroon
40.97
in 2014
Albania rank
159th
Cameroon rank
162nd

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Albania
  • Cameroon
0204060200520092014

How they compare

Albania currently reports 44.54 against 40.97 in Cameroon, a difference of 3.57.

That makes Albania's figure about 1.1 times Cameroon's.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Cameroon ahead.

Albania ranks 159th and Cameroon ranks 162nd of 181 countries.

Cameroon has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Albania Cameroon Difference Ahead
2000s 31.97 50.77 18.8 Cameroon
2010s 15.74 49.05 33.31 Cameroon

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Albania or Cameroon?
Albania, at 44.54 against 40.97 in Cameroon as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Albania and Cameroon?
3.57, with Albania ahead.
How many years of comparable data are there for Albania and Cameroon?
10 years are reported by both, from 2005 to 2014.
How do Albania and Cameroon rank globally for dealing with construction permits (db06-15 methodology) - score?
Albania ranks 159th and Cameroon ranks 162nd of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.