Austria vs Dominican Republic: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Austria
- Dominican Republic
How they compare
Austria currently reports 70.93 against 70.88 in Dominican Republic, a difference of 0.05.
Across all 10 years both countries report, Austria has been ahead every year.
Austria ranks 64th and Dominican Republic ranks 65th of 181 countries.
Austria has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Austria | Dominican Republic | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 71.65 | 65.72 | 5.94 | Austria |
| 2010s | 70.83 | 68.94 | 1.89 | Austria |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Austria or Dominican Republic?
- Austria, at 70.93 against 70.88 in Dominican Republic as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Austria and Dominican Republic?
- 0.05, with Austria ahead.
- How many years of comparable data are there for Austria and Dominican Republic?
- 10 years are reported by both, from 2005 to 2014.
- How do Austria and Dominican Republic rank globally for dealing with construction permits (db06-15 methodology) - score?
- Austria ranks 64th and Dominican Republic ranks 65th of 181 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.