Bahamas vs East Timor: Dealing with construction permits (DB06-15 methodology) - Score

Bahamas
67.48
in 2014
East Timor
67.52
in 2014
Bahamas rank
84th
East Timor rank
83rd

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Bahamas
  • East Timor
0204060200520092014

How they compare

East Timor currently reports 67.52 against 67.48 in Bahamas, a difference of 0.04.

The two have swapped places 1 time across 8 shared years of data; in 2007 it was Bahamas ahead.

Bahamas ranks 84th and East Timor ranks 83rd of 181 countries.

Bahamas has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Bahamas East Timor Difference Ahead
2000s 67.45 66.65 0.8006 Bahamas
2010s 67.57 67.39 0.1869 Bahamas

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Bahamas or East Timor?
East Timor, at 67.52 against 67.48 in Bahamas as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Bahamas and East Timor?
0.04, with East Timor ahead.
How many years of comparable data are there for Bahamas and East Timor?
8 years are reported by both, from 2007 to 2014.
How do Bahamas and East Timor rank globally for dealing with construction permits (db06-15 methodology) - score?
Bahamas ranks 84th and East Timor ranks 83rd of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.