Bangladesh vs Venezuela, Bolivarian Republic of: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Bangladesh
- Venezuela, Bolivarian Republic of
How they compare
Bangladesh currently reports 56.84 against 55.24 in Venezuela, Bolivarian Republic of, a difference of 1.6.
The two have swapped places 1 time across 10 shared years of data; in 2005 it was Venezuela, Bolivarian Republic of ahead.
Bangladesh ranks 130th and Venezuela, Bolivarian Republic of ranks 133rd of 183 countries.
Across the 2 decades both report, Bangladesh averaged higher in 1 and Venezuela, Bolivarian Republic of in 1.
Head to head by decade
| Decade | Bangladesh | Venezuela, Bolivarian Republic of | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 49.22 | 51.18 | 1.96 | Venezuela, Bolivarian Republic of |
| 2010s | 54.68 | 53.27 | 1.41 | Bangladesh |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Bangladesh or Venezuela, Bolivarian Republic of?
- Bangladesh, at 56.84 against 55.24 in Venezuela, Bolivarian Republic of as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Bangladesh and Venezuela, Bolivarian Republic of?
- 1.6, with Bangladesh ahead.
- How many years of comparable data are there for Bangladesh and Venezuela, Bolivarian Republic of?
- 10 years are reported by both, from 2005 to 2014.
- How do Bangladesh and Venezuela, Bolivarian Republic of rank globally for dealing with construction permits (db06-15 methodology) - score?
- Bangladesh ranks 130th and Venezuela, Bolivarian Republic of ranks 133rd of 183 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.