Belarus vs Jamaica: Dealing with construction permits (DB06-15 methodology) - Score

Belarus
65.91
in 2014
Jamaica
65.52
in 2014
Belarus rank
95th
Jamaica rank
96th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Belarus
  • Jamaica
0204060200520092014

How they compare

Belarus currently reports 65.91 against 65.52 in Jamaica, a difference of 0.39.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Jamaica ahead.

Belarus ranks 95th and Jamaica ranks 96th of 181 countries.

Jamaica has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Belarus Jamaica Difference Ahead
2000s 48.85 60.27 11.42 Jamaica
2010s 64.58 66.72 2.14 Jamaica

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Belarus or Jamaica?
Belarus, at 65.91 against 65.52 in Jamaica as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Belarus and Jamaica?
0.39, with Belarus ahead.
How many years of comparable data are there for Belarus and Jamaica?
10 years are reported by both, from 2005 to 2014.
How do Belarus and Jamaica rank globally for dealing with construction permits (db06-15 methodology) - score?
Belarus ranks 95th and Jamaica ranks 96th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.