Belgium vs Seychelles: Dealing with construction permits (DB06-15 methodology) - Score

Belgium
73.68
in 2014
Seychelles
73.88
in 2014
Belgium rank
49th
Seychelles rank
48th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Belgium
  • Seychelles
020406080200520092014

How they compare

Seychelles currently reports 73.88 against 73.68 in Belgium, a difference of 0.2.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Belgium ahead.

Belgium ranks 49th and Seychelles ranks 48th of 181 countries.

Across the 2 decades both report, Belgium averaged higher in 1 and Seychelles in 1.

Head to head by decade

Decade Belgium Seychelles Difference Ahead
2000s 73.42 72.36 1.06 Belgium
2010s 73.63 73.7 0.0713 Seychelles

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Belgium or Seychelles?
Seychelles, at 73.88 against 73.68 in Belgium as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Belgium and Seychelles?
0.2, with Seychelles ahead.
How many years of comparable data are there for Belgium and Seychelles?
10 years are reported by both, from 2005 to 2014.
How do Belgium and Seychelles rank globally for dealing with construction permits (db06-15 methodology) - score?
Belgium ranks 49th and Seychelles ranks 48th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.