Bosnia and Herzegovina vs Republic of Moldova: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Bosnia and Herzegovina
- Republic of Moldova
How they compare
Republic of Moldova currently reports 36.27 against 35.87 in Bosnia and Herzegovina, a difference of 0.4.
Across all 10 years both countries report, Republic of Moldova has been ahead every year.
Bosnia and Herzegovina ranks 172nd and Republic of Moldova ranks 171st of 184 countries.
Republic of Moldova has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Bosnia and Herzegovina | Republic of Moldova | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 21.76 | 28.36 | 6.61 | Republic of Moldova |
| 2010s | 33.3 | 34.79 | 1.49 | Republic of Moldova |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Bosnia and Herzegovina or Republic of Moldova?
- Republic of Moldova, at 36.27 against 35.87 in Bosnia and Herzegovina as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Bosnia and Herzegovina and Republic of Moldova?
- 0.4, with Republic of Moldova ahead.
- How many years of comparable data are there for Bosnia and Herzegovina and Republic of Moldova?
- 10 years are reported by both, from 2005 to 2014.
- How do Bosnia and Herzegovina and Republic of Moldova rank globally for dealing with construction permits (db06-15 methodology) - score?
- Bosnia and Herzegovina ranks 172nd and Republic of Moldova ranks 171st of 184 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.