Botswana vs Mozambique: Dealing with construction permits (DB06-15 methodology) - Score

Botswana
70
in 2014
Mozambique
70.25
in 2014
Botswana rank
74th
Mozambique rank
71st

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Botswana
  • Mozambique
020406080200520092014

How they compare

Mozambique currently reports 70.25 against 70 in Botswana, a difference of 0.25.

The two have swapped places 3 times across 10 shared years of data; in 2005 it was Botswana ahead.

Botswana ranks 74th and Mozambique ranks 71st of 181 countries.

Across the 2 decades both report, Botswana averaged higher in 1 and Mozambique in 1.

Head to head by decade

Decade Botswana Mozambique Difference Ahead
2000s 51.97 51.33 0.6351 Botswana
2010s 60.3 62.72 2.41 Mozambique

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Botswana or Mozambique?
Mozambique, at 70.25 against 70 in Botswana as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Botswana and Mozambique?
0.25, with Mozambique ahead.
How many years of comparable data are there for Botswana and Mozambique?
10 years are reported by both, from 2005 to 2014.
How do Botswana and Mozambique rank globally for dealing with construction permits (db06-15 methodology) - score?
Botswana ranks 74th and Mozambique ranks 71st of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.