Botswana vs Netherlands: Dealing with construction permits (DB06-15 methodology) - Score

Botswana
70
in 2014
Netherlands
70.11
in 2014
Botswana rank
74th
Netherlands rank
73rd

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Botswana
  • Netherlands
020406080200520092014

How they compare

Netherlands currently reports 70.11 against 70 in Botswana, a difference of 0.11.

Across all 10 years both countries report, Netherlands has been ahead every year.

Botswana ranks 74th and Netherlands ranks 73rd of 181 countries.

Netherlands has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Botswana Netherlands Difference Ahead
2000s 51.97 67.42 15.45 Netherlands
2010s 60.3 68.4 8.09 Netherlands

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Botswana or Netherlands?
Netherlands, at 70.11 against 70 in Botswana as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Botswana and Netherlands?
0.11, with Netherlands ahead.
How many years of comparable data are there for Botswana and Netherlands?
10 years are reported by both, from 2005 to 2014.
How do Botswana and Netherlands rank globally for dealing with construction permits (db06-15 methodology) - score?
Botswana ranks 74th and Netherlands ranks 73rd of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.