Cabo Verde vs Mongolia: Dealing with construction permits (DB06-15 methodology) - Score

Cabo Verde
73.57
in 2014
Mongolia
73.19
in 2014
Cabo Verde rank
50th
Mongolia rank
51st

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Cabo Verde
  • Mongolia
020406080200520092014

How they compare

Cabo Verde currently reports 73.57 against 73.19 in Mongolia, a difference of 0.38.

Across all 10 years both countries report, Cabo Verde has been ahead every year.

Cabo Verde ranks 50th and Mongolia ranks 51st of 181 countries.

Cabo Verde has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Cabo Verde Mongolia Difference Ahead
2000s 68.03 58.76 9.27 Cabo Verde
2010s 70.96 67.51 3.45 Cabo Verde

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Cabo Verde or Mongolia?
Cabo Verde, at 73.57 against 73.19 in Mongolia as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Cabo Verde and Mongolia?
0.38, with Cabo Verde ahead.
How many years of comparable data are there for Cabo Verde and Mongolia?
10 years are reported by both, from 2005 to 2014.
How do Cabo Verde and Mongolia rank globally for dealing with construction permits (db06-15 methodology) - score?
Cabo Verde ranks 50th and Mongolia ranks 51st of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.