Cape Verde vs Poland: Dealing with construction permits (DB06-15 methodology) - Score

Cape Verde
73.57
in 2014
Poland
74
in 2014
Cape Verde rank
50th
Poland rank
47th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Cape Verde
  • Poland
020406080200520092014

How they compare

Poland currently reports 74 against 73.57 in Cape Verde, a difference of 0.43.

The two have swapped places 3 times across 10 shared years of data; in 2005 it was Cape Verde ahead.

Cape Verde ranks 50th and Poland ranks 47th of 181 countries.

Cape Verde has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Cape Verde Poland Difference Ahead
2000s 68.03 52.78 15.26 Cape Verde
2010s 70.96 67.27 3.69 Cape Verde

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Cape Verde or Poland?
Poland, at 74 against 73.57 in Cape Verde as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Cape Verde and Poland?
0.43, with Poland ahead.
How many years of comparable data are there for Cape Verde and Poland?
10 years are reported by both, from 2005 to 2014.
How do Cape Verde and Poland rank globally for dealing with construction permits (db06-15 methodology) - score?
Cape Verde ranks 50th and Poland ranks 47th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.