Cameroon vs Sierra Leone: Dealing with construction permits (DB06-15 methodology) - Score

Cameroon
40.97
in 2014
Sierra Leone
40.64
in 2014
Cameroon rank
162nd
Sierra Leone rank
163rd

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Cameroon
  • Sierra Leone
1020304050200520092014

How they compare

Cameroon currently reports 40.97 against 40.64 in Sierra Leone, a difference of 0.33.

Across all 10 years both countries report, Cameroon has been ahead every year.

Cameroon ranks 162nd and Sierra Leone ranks 163rd of 181 countries.

Cameroon has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Cameroon Sierra Leone Difference Ahead
2000s 50.77 21.75 29.02 Cameroon
2010s 49.05 36.41 12.64 Cameroon

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Cameroon or Sierra Leone?
Cameroon, at 40.97 against 40.64 in Sierra Leone as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Cameroon and Sierra Leone?
0.33, with Cameroon ahead.
How many years of comparable data are there for Cameroon and Sierra Leone?
10 years are reported by both, from 2005 to 2014.
How do Cameroon and Sierra Leone rank globally for dealing with construction permits (db06-15 methodology) - score?
Cameroon ranks 162nd and Sierra Leone ranks 163rd of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.