Central African Republic vs China: Dealing with construction permits (DB06-15 methodology) - Score

Central African Republic
32.13
in 2014
China
30.67
in 2014
Central African Republic rank
178th
China rank
179th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Central African Republic
  • China
0102030200520092014

How they compare

Central African Republic currently reports 32.13 against 30.67 in China, a difference of 1.46.

Across all 10 years both countries report, Central African Republic has been ahead every year.

Central African Republic ranks 178th and China ranks 179th of 184 countries.

Central African Republic has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Central African Republic China Difference Ahead
2000s 32.13 5.31 26.82 Central African Republic
2010s 32.13 22.6 9.53 Central African Republic

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Central African Republic or China?
Central African Republic, at 32.13 against 30.67 in China as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Central African Republic and China?
1.46, with Central African Republic ahead.
How many years of comparable data are there for Central African Republic and China?
10 years are reported by both, from 2005 to 2014.
How do Central African Republic and China rank globally for dealing with construction permits (db06-15 methodology) - score?
Central African Republic ranks 178th and China ranks 179th of 184 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Central African Republic vs China: Dealing with construction permits (DB06-15 methodology) - Score. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db06-15-methodology-score/central-african-republic/china/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-db06-15-methodology-score/central-african-republic/china/">Central African Republic vs China: Dealing with construction permits (DB06-15 methodology) - Score</a> — Statizoid

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
184 places, 1,819 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.