Central African Republic vs Madagascar: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Central African Republic
- Madagascar
How they compare
Madagascar currently reports 34.53 against 32.13 in Central African Republic, a difference of 2.4.
That makes Madagascar's figure about 1.1 times Central African Republic's.
Across all 10 years both countries report, Madagascar has been ahead every year.
Central African Republic ranks 175th and Madagascar ranks 172nd of 181 countries.
Madagascar has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Central African Republic | Madagascar | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 32.13 | 42.24 | 10.11 | Madagascar |
| 2010s | 32.13 | 38.96 | 6.83 | Madagascar |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Central African Republic or Madagascar?
- Madagascar, at 34.53 against 32.13 in Central African Republic as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Central African Republic and Madagascar?
- 2.4, with Madagascar ahead.
- How many years of comparable data are there for Central African Republic and Madagascar?
- 10 years are reported by both, from 2005 to 2014.
- How do Central African Republic and Madagascar rank globally for dealing with construction permits (db06-15 methodology) - score?
- Central African Republic ranks 175th and Madagascar ranks 172nd of 181 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.