Central African Republic vs Zimbabwe: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Central African Republic
- Zimbabwe
How they compare
Central African Republic currently reports 32.13 against 26.67 in Zimbabwe, a difference of 5.46.
That makes Central African Republic's figure about 1.2 times Zimbabwe's.
The two have swapped places 3 times across 10 shared years of data; in 2005 it was Zimbabwe ahead.
Central African Republic ranks 175th and Zimbabwe ranks 177th of 181 groups.
Across the 2 decades both report, Central African Republic averaged higher in 1 and Zimbabwe in 1.
Head to head by decade
| Decade | Central African Republic | Zimbabwe | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 32.13 | 54.75 | 22.62 | Zimbabwe |
| 2010s | 32.13 | 31.26 | 0.869 | Central African Republic |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Central African Republic or Zimbabwe?
- Central African Republic, at 32.13 against 26.67 in Zimbabwe as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Central African Republic and Zimbabwe?
- 5.46, with Central African Republic ahead.
- How many years of comparable data are there for Central African Republic and Zimbabwe?
- 10 years are reported by both, from 2005 to 2014.
- How do Central African Republic and Zimbabwe rank globally for dealing with construction permits (db06-15 methodology) - score?
- Central African Republic ranks 175th and Zimbabwe ranks 177th of 181 groups.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.