China vs Zimbabwe: Dealing with construction permits (DB06-15 methodology) - Score

China
30.67
in 2014
Zimbabwe
26.67
in 2014
China rank
176th
Zimbabwe rank
177th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • China
  • Zimbabwe
0204060200520092014

How they compare

China currently reports 30.67 against 26.67 in Zimbabwe, a difference of 4.

That makes China's figure about 1.2 times Zimbabwe's.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Zimbabwe ahead.

China ranks 176th and Zimbabwe ranks 177th of 181 countries.

Zimbabwe has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade China Zimbabwe Difference Ahead
2000s 5.31 54.75 49.44 Zimbabwe
2010s 22.6 31.26 8.66 Zimbabwe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, China or Zimbabwe?
China, at 30.67 against 26.67 in Zimbabwe as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between China and Zimbabwe?
4, with China ahead.
How many years of comparable data are there for China and Zimbabwe?
10 years are reported by both, from 2005 to 2014.
How do China and Zimbabwe rank globally for dealing with construction permits (db06-15 methodology) - score?
China ranks 176th and Zimbabwe ranks 177th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.