Colombia vs Jamaica: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Colombia
- Jamaica
How they compare
Colombia currently reports 65.92 against 65.52 in Jamaica, a difference of 0.4.
The two have swapped places 2 times across 10 shared years of data; in 2005 it was Colombia ahead.
Colombia ranks 94th and Jamaica ranks 96th of 181 countries.
Jamaica has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Colombia | Jamaica | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 58.32 | 60.27 | 1.95 | Jamaica |
| 2010s | 64.62 | 66.72 | 2.1 | Jamaica |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Colombia or Jamaica?
- Colombia, at 65.92 against 65.52 in Jamaica as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Colombia and Jamaica?
- 0.4, with Colombia ahead.
- How many years of comparable data are there for Colombia and Jamaica?
- 10 years are reported by both, from 2005 to 2014.
- How do Colombia and Jamaica rank globally for dealing with construction permits (db06-15 methodology) - score?
- Colombia ranks 94th and Jamaica ranks 96th of 181 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.