Comoros vs Viet Nam: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Comoros
- Viet Nam
How they compare
Comoros currently reports 79.88 against 78.66 in Viet Nam, a difference of 1.22.
Across all 10 years both countries report, Comoros has been ahead every year.
Comoros ranks 25th and Viet Nam ranks 28th of 181 countries.
Comoros has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Comoros | Viet Nam | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 79.23 | 77.72 | 1.51 | Comoros |
| 2010s | 79.9 | 78.31 | 1.6 | Comoros |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Comoros or Viet Nam?
- Comoros, at 79.88 against 78.66 in Viet Nam as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Comoros and Viet Nam?
- 1.22, with Comoros ahead.
- How many years of comparable data are there for Comoros and Viet Nam?
- 10 years are reported by both, from 2005 to 2014.
- How do Comoros and Viet Nam rank globally for dealing with construction permits (db06-15 methodology) - score?
- Comoros ranks 25th and Viet Nam ranks 28th of 181 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.