Democratic Republic of Congo vs Kiribati: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Democratic Republic of Congo
- Kiribati
How they compare
Kiribati currently reports 47.82 against 47.62 in Democratic Republic of Congo, a difference of 0.2.
The two have swapped places 3 times across 10 shared years of data; in 2005 it was Democratic Republic of Congo ahead.
Democratic Republic of Congo ranks 154th and Kiribati ranks 151st of 184 countries.
Democratic Republic of Congo has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Democratic Republic of Congo | Kiribati | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 40.87 | 39.81 | 1.06 | Democratic Republic of Congo |
| 2010s | 53.62 | 46.08 | 7.54 | Democratic Republic of Congo |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Democratic Republic of Congo or Kiribati?
- Kiribati, at 47.82 against 47.62 in Democratic Republic of Congo as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Democratic Republic of Congo and Kiribati?
- 0.2, with Kiribati ahead.
- How many years of comparable data are there for Democratic Republic of Congo and Kiribati?
- 10 years are reported by both, from 2005 to 2014.
- How do Democratic Republic of Congo and Kiribati rank globally for dealing with construction permits (db06-15 methodology) - score?
- Democratic Republic of Congo ranks 154th and Kiribati ranks 151st of 184 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.