Democratic Republic of Congo vs Solomon Islands: Dealing with construction permits (DB06-15 methodology) - Score

Democratic Republic of Congo
47.62
in 2014
Solomon Islands
47.65
in 2014
Democratic Republic of Congo rank
153rd
Solomon Islands rank
152nd

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Democratic Republic of Congo
  • Solomon Islands
0204060200520092014

How they compare

Solomon Islands currently reports 47.65 against 47.62 in Democratic Republic of Congo, a difference of 0.03.

The two have swapped places 2 times across 10 shared years of data; in 2005 it was Solomon Islands ahead.

Democratic Republic of Congo ranks 153rd and Solomon Islands ranks 152nd of 181 countries.

Across the 2 decades both report, Democratic Republic of Congo averaged higher in 1 and Solomon Islands in 1.

Head to head by decade

Decade Democratic Republic of Congo Solomon Islands Difference Ahead
2000s 40.87 47.65 6.78 Solomon Islands
2010s 53.62 47.65 5.97 Democratic Republic of Congo

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Democratic Republic of Congo or Solomon Islands?
Solomon Islands, at 47.65 against 47.62 in Democratic Republic of Congo as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Democratic Republic of Congo and Solomon Islands?
0.03, with Solomon Islands ahead.
How many years of comparable data are there for Democratic Republic of Congo and Solomon Islands?
10 years are reported by both, from 2005 to 2014.
How do Democratic Republic of Congo and Solomon Islands rank globally for dealing with construction permits (db06-15 methodology) - score?
Democratic Republic of Congo ranks 153rd and Solomon Islands ranks 152nd of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.