Democratic Republic of Congo vs Solomon Islands: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Democratic Republic of Congo
- Solomon Islands
How they compare
Solomon Islands currently reports 47.65 against 47.62 in Democratic Republic of Congo, a difference of 0.03.
The two have swapped places 2 times across 10 shared years of data; in 2005 it was Solomon Islands ahead.
Democratic Republic of Congo ranks 153rd and Solomon Islands ranks 152nd of 181 countries.
Across the 2 decades both report, Democratic Republic of Congo averaged higher in 1 and Solomon Islands in 1.
Head to head by decade
| Decade | Democratic Republic of Congo | Solomon Islands | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 40.87 | 47.65 | 6.78 | Solomon Islands |
| 2010s | 53.62 | 47.65 | 5.97 | Democratic Republic of Congo |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Democratic Republic of Congo or Solomon Islands?
- Solomon Islands, at 47.65 against 47.62 in Democratic Republic of Congo as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Democratic Republic of Congo and Solomon Islands?
- 0.03, with Solomon Islands ahead.
- How many years of comparable data are there for Democratic Republic of Congo and Solomon Islands?
- 10 years are reported by both, from 2005 to 2014.
- How do Democratic Republic of Congo and Solomon Islands rank globally for dealing with construction permits (db06-15 methodology) - score?
- Democratic Republic of Congo ranks 153rd and Solomon Islands ranks 152nd of 181 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.