Croatia vs Solomon Islands: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Croatia
- Solomon Islands
How they compare
Solomon Islands currently reports 47.65 against 47.11 in Croatia, a difference of 0.54.
Across all 10 years both countries report, Solomon Islands has been ahead every year.
Croatia ranks 155th and Solomon Islands ranks 152nd of 181 countries.
Solomon Islands has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Croatia | Solomon Islands | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 14.64 | 47.65 | 33.01 | Solomon Islands |
| 2010s | 28.71 | 47.65 | 18.95 | Solomon Islands |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Croatia or Solomon Islands?
- Solomon Islands, at 47.65 against 47.11 in Croatia as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Croatia and Solomon Islands?
- 0.54, with Solomon Islands ahead.
- How many years of comparable data are there for Croatia and Solomon Islands?
- 10 years are reported by both, from 2005 to 2014.
- How do Croatia and Solomon Islands rank globally for dealing with construction permits (db06-15 methodology) - score?
- Croatia ranks 155th and Solomon Islands ranks 152nd of 181 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.