Denmark vs Djibouti: Dealing with construction permits (DB06-15 methodology) - Score

Denmark
89.84
in 2014
Djibouti
60.7
in 2014
Denmark rank
2nd
Djibouti rank
1st

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Denmark
  • Djibouti
020406080100200520092014

How they compare

Denmark currently reports 89.84 against 60.7 in Djibouti, a difference of 29.14.

That makes Denmark's figure about 1.5 times Djibouti's.

Across all 10 years both countries report, Denmark has been ahead every year.

Denmark ranks 2nd and Djibouti ranks 1st of 181 countries.

Denmark has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Denmark Djibouti Difference Ahead
2000s 91.59 60.54 31.05 Denmark
2010s 90.83 57.18 33.65 Denmark

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Denmark or Djibouti?
Denmark, at 89.84 against 60.7 in Djibouti as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Denmark and Djibouti?
29.14, with Denmark ahead.
How many years of comparable data are there for Denmark and Djibouti?
10 years are reported by both, from 2005 to 2014.
How do Denmark and Djibouti rank globally for dealing with construction permits (db06-15 methodology) - score?
Denmark ranks 2nd and Djibouti ranks 1st of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.