Dominican Republic vs Equatorial Guinea: Dealing with construction permits (DB06-15 methodology) - Score

Dominican Republic
70.88
in 2014
Equatorial Guinea
71.2
in 2014
Dominican Republic rank
65th
Equatorial Guinea rank
62nd

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Dominican Republic
  • Equatorial Guinea
020406080200520092014

How they compare

Equatorial Guinea currently reports 71.2 against 70.88 in Dominican Republic, a difference of 0.32.

Across all 10 years both countries report, Equatorial Guinea has been ahead every year.

Dominican Republic ranks 65th and Equatorial Guinea ranks 62nd of 181 countries.

Equatorial Guinea has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Dominican Republic Equatorial Guinea Difference Ahead
2000s 65.72 71.19 5.47 Equatorial Guinea
2010s 68.94 71.19 2.26 Equatorial Guinea

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Dominican Republic or Equatorial Guinea?
Equatorial Guinea, at 71.2 against 70.88 in Dominican Republic as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Dominican Republic and Equatorial Guinea?
0.32, with Equatorial Guinea ahead.
How many years of comparable data are there for Dominican Republic and Equatorial Guinea?
10 years are reported by both, from 2005 to 2014.
How do Dominican Republic and Equatorial Guinea rank globally for dealing with construction permits (db06-15 methodology) - score?
Dominican Republic ranks 65th and Equatorial Guinea ranks 62nd of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.