Dominican Republic vs Panama: Dealing with construction permits (DB06-15 methodology) - Score

Dominican Republic
70.88
in 2014
Panama
70.6
in 2014
Dominican Republic rank
65th
Panama rank
67th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Dominican Republic
  • Panama
020406080200520092014

How they compare

Dominican Republic currently reports 70.88 against 70.6 in Panama, a difference of 0.28.

The two have swapped places 4 times across 10 shared years of data; in 2005 it was Dominican Republic ahead.

Dominican Republic ranks 65th and Panama ranks 67th of 181 countries.

Across the 2 decades both report, Dominican Republic averaged higher in 1 and Panama in 1.

Head to head by decade

Decade Dominican Republic Panama Difference Ahead
2000s 65.72 63.95 1.77 Dominican Republic
2010s 68.94 69.46 0.5191 Panama

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Dominican Republic or Panama?
Dominican Republic, at 70.88 against 70.6 in Panama as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Dominican Republic and Panama?
0.28, with Dominican Republic ahead.
How many years of comparable data are there for Dominican Republic and Panama?
10 years are reported by both, from 2005 to 2014.
How do Dominican Republic and Panama rank globally for dealing with construction permits (db06-15 methodology) - score?
Dominican Republic ranks 65th and Panama ranks 67th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.