Ecuador vs Panama: Dealing with construction permits (DB06-15 methodology) - Score

Ecuador
70.54
in 2014
Panama
70.6
in 2014
Ecuador rank
68th
Panama rank
67th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Ecuador
  • Panama
020406080200520092014

How they compare

Panama currently reports 70.6 against 70.54 in Ecuador, a difference of 0.06.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Ecuador ahead.

Ecuador ranks 68th and Panama ranks 67th of 181 countries.

Ecuador has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Ecuador Panama Difference Ahead
2000s 68.32 63.95 4.38 Ecuador
2010s 70.18 69.46 0.728 Ecuador

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Ecuador or Panama?
Panama, at 70.6 against 70.54 in Ecuador as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Ecuador and Panama?
0.06, with Panama ahead.
How many years of comparable data are there for Ecuador and Panama?
10 years are reported by both, from 2005 to 2014.
How do Ecuador and Panama rank globally for dealing with construction permits (db06-15 methodology) - score?
Ecuador ranks 68th and Panama ranks 67th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.