Eswatini vs Switzerland: Dealing with construction permits (DB06-15 methodology) - Score

Eswatini
75.86
in 2014
Switzerland
75.65
in 2014
Eswatini rank
38th
Switzerland rank
40th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Eswatini
  • Switzerland
020406080200520092014

How they compare

Eswatini currently reports 75.86 against 75.65 in Switzerland, a difference of 0.21.

The two have swapped places 2 times across 10 shared years of data; in 2005 it was Eswatini ahead.

Eswatini ranks 38th and Switzerland ranks 40th of 181 countries.

Eswatini has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Eswatini Switzerland Difference Ahead
2000s 75.54 74.16 1.38 Eswatini
2010s 75.54 75.07 0.4625 Eswatini

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Eswatini or Switzerland?
Eswatini, at 75.86 against 75.65 in Switzerland as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Eswatini and Switzerland?
0.21, with Eswatini ahead.
How many years of comparable data are there for Eswatini and Switzerland?
10 years are reported by both, from 2005 to 2014.
How do Eswatini and Switzerland rank globally for dealing with construction permits (db06-15 methodology) - score?
Eswatini ranks 38th and Switzerland ranks 40th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.