Gambia vs Palau: Dealing with construction permits (DB06-15 methodology) - Score

Gambia
66.39
in 2014
Palau
66.71
in 2014
Gambia rank
91st
Palau rank
89th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Gambia
  • Palau
0204060200520092014

How they compare

Palau currently reports 66.71 against 66.39 in Gambia, a difference of 0.32.

The two have swapped places 2 times across 10 shared years of data; in 2005 it was Palau ahead.

Gambia ranks 91st and Palau ranks 89th of 181 countries.

Across the 2 decades both report, Gambia averaged higher in 1 and Palau in 1.

Head to head by decade

Decade Gambia Palau Difference Ahead
2000s 56.63 64.01 7.38 Palau
2010s 64.23 64.18 0.0473 Gambia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Gambia or Palau?
Palau, at 66.71 against 66.39 in Gambia as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Gambia and Palau?
0.32, with Palau ahead.
How many years of comparable data are there for Gambia and Palau?
10 years are reported by both, from 2005 to 2014.
How do Gambia and Palau rank globally for dealing with construction permits (db06-15 methodology) - score?
Gambia ranks 91st and Palau ranks 89th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.