Grenada vs Mauritania: Dealing with construction permits (DB06-15 methodology) - Score

Grenada
71.35
in 2014
Mauritania
71.3
in 2014
Grenada rank
60th
Mauritania rank
61st

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Grenada
  • Mauritania
020406080200520092014

How they compare

Grenada currently reports 71.35 against 71.3 in Mauritania, a difference of 0.05.

The two have swapped places 2 times across 10 shared years of data; in 2005 it was Grenada ahead.

Grenada ranks 60th and Mauritania ranks 61st of 181 countries.

Grenada has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Grenada Mauritania Difference Ahead
2000s 68.46 58.4 10.06 Grenada
2010s 70.72 69.15 1.57 Grenada

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Grenada or Mauritania?
Grenada, at 71.35 against 71.3 in Mauritania as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Grenada and Mauritania?
0.05, with Grenada ahead.
How many years of comparable data are there for Grenada and Mauritania?
10 years are reported by both, from 2005 to 2014.
How do Grenada and Mauritania rank globally for dealing with construction permits (db06-15 methodology) - score?
Grenada ranks 60th and Mauritania ranks 61st of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.