Guyana vs Slovakia: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Guyana
- Slovakia
How they compare
Slovakia currently reports 61.3 against 60.17 in Guyana, a difference of 1.13.
Across all 10 years both countries report, Slovakia has been ahead every year.
Guyana ranks 122nd and Slovakia ranks 119th of 181 countries.
Slovakia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Guyana | Slovakia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 51.76 | 61.24 | 9.47 | Slovakia |
| 2010s | 59.28 | 61.42 | 2.14 | Slovakia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Guyana or Slovakia?
- Slovakia, at 61.3 against 60.17 in Guyana as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Guyana and Slovakia?
- 1.13, with Slovakia ahead.
- How many years of comparable data are there for Guyana and Slovakia?
- 10 years are reported by both, from 2005 to 2014.
- How do Guyana and Slovakia rank globally for dealing with construction permits (db06-15 methodology) - score?
- Guyana ranks 122nd and Slovakia ranks 119th of 181 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.