Hungary vs Montenegro: Dealing with construction permits (DB06-15 methodology) - Score

Hungary
62.31
in 2014
Montenegro
62.06
in 2014
Hungary rank
109th
Montenegro rank
112th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Hungary
  • Montenegro
0204060200520092014

How they compare

Hungary currently reports 62.31 against 62.06 in Montenegro, a difference of 0.25.

Across all 9 years both countries report, Hungary has been ahead every year.

Hungary ranks 109th and Montenegro ranks 112th of 181 countries.

Hungary has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Hungary Montenegro Difference Ahead
2000s 67.27 37.2 30.07 Hungary
2010s 67.09 44.44 22.65 Hungary

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Hungary or Montenegro?
Hungary, at 62.31 against 62.06 in Montenegro as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Hungary and Montenegro?
0.25, with Hungary ahead.
How many years of comparable data are there for Hungary and Montenegro?
9 years are reported by both, from 2006 to 2014.
How do Hungary and Montenegro rank globally for dealing with construction permits (db06-15 methodology) - score?
Hungary ranks 109th and Montenegro ranks 112th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.