Indonesia vs Venezuela: Dealing with construction permits (DB06-15 methodology) - Score

Indonesia
56.79
in 2014
Venezuela
55.24
in 2014
Indonesia rank
130th
Venezuela rank
132nd

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Indonesia
  • Venezuela
0204060200520092014

How they compare

Indonesia currently reports 56.79 against 55.24 in Venezuela, a difference of 1.55.

The two have swapped places 3 times across 10 shared years of data; in 2005 it was Venezuela ahead.

Indonesia ranks 130th and Venezuela ranks 132nd of 181 countries.

Indonesia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Indonesia Venezuela Difference Ahead
2000s 54.47 51.18 3.29 Indonesia
2010s 59.18 53.27 5.91 Indonesia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Indonesia or Venezuela?
Indonesia, at 56.79 against 55.24 in Venezuela as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Indonesia and Venezuela?
1.55, with Indonesia ahead.
How many years of comparable data are there for Indonesia and Venezuela?
10 years are reported by both, from 2005 to 2014.
How do Indonesia and Venezuela rank globally for dealing with construction permits (db06-15 methodology) - score?
Indonesia ranks 130th and Venezuela ranks 132nd of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.