Ireland vs East Timor: Dealing with construction permits (DB06-15 methodology) - Score

Ireland
67.96
in 2014
East Timor
67.52
in 2014
Ireland rank
82nd
East Timor rank
83rd

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Ireland
  • East Timor
0204060200520092014

How they compare

Ireland currently reports 67.96 against 67.52 in East Timor, a difference of 0.44.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was East Timor ahead.

Ireland ranks 82nd and East Timor ranks 83rd of 181 countries.

East Timor has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Ireland East Timor Difference Ahead
2000s 63.65 66.06 2.41 East Timor
2010s 62.84 67.39 4.54 East Timor

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Ireland or East Timor?
Ireland, at 67.96 against 67.52 in East Timor as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Ireland and East Timor?
0.44, with Ireland ahead.
How many years of comparable data are there for Ireland and East Timor?
10 years are reported by both, from 2005 to 2014.
How do Ireland and East Timor rank globally for dealing with construction permits (db06-15 methodology) - score?
Ireland ranks 82nd and East Timor ranks 83rd of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.