Japan vs Micronesia (country): Dealing with construction permits (DB06-15 methodology) - Score

Japan
81.82
in 2014
Micronesia (country)
81.45
in 2014
Japan rank
16th
Micronesia (country) rank
18th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Japan
  • Micronesia (country)
020406080200520092014

How they compare

Japan currently reports 81.82 against 81.45 in Micronesia (country), a difference of 0.37.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Micronesia (country) ahead.

Japan ranks 16th and Micronesia (country) ranks 18th of 181 countries.

Across the 2 decades both report, Japan averaged higher in 1 and Micronesia (country) in 1.

Head to head by decade

Decade Japan Micronesia (country) Difference Ahead
2000s 76.23 80.97 4.75 Micronesia (country)
2010s 81.94 81.29 0.6466 Japan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Japan or Micronesia (country)?
Japan, at 81.82 against 81.45 in Micronesia (country) as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Japan and Micronesia (country)?
0.37, with Japan ahead.
How many years of comparable data are there for Japan and Micronesia (country)?
10 years are reported by both, from 2005 to 2014.
How do Japan and Micronesia (country) rank globally for dealing with construction permits (db06-15 methodology) - score?
Japan ranks 16th and Micronesia (country) ranks 18th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.