Kazakhstan vs Malawi: Dealing with construction permits (DB06-15 methodology) - Score

Kazakhstan
51.12
in 2014
Malawi
50.28
in 2014
Kazakhstan rank
144th
Malawi rank
147th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Kazakhstan
  • Malawi
020406080200520092014

How they compare

Kazakhstan currently reports 51.12 against 50.28 in Malawi, a difference of 0.84.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Malawi ahead.

Kazakhstan ranks 144th and Malawi ranks 147th of 181 countries.

Malawi has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Kazakhstan Malawi Difference Ahead
2000s 36.06 75.2 39.14 Malawi
2010s 48.08 63.81 15.73 Malawi

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Kazakhstan or Malawi?
Kazakhstan, at 51.12 against 50.28 in Malawi as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Kazakhstan and Malawi?
0.84, with Kazakhstan ahead.
How many years of comparable data are there for Kazakhstan and Malawi?
10 years are reported by both, from 2005 to 2014.
How do Kazakhstan and Malawi rank globally for dealing with construction permits (db06-15 methodology) - score?
Kazakhstan ranks 144th and Malawi ranks 147th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.