Kosovo vs Marshall Islands: Dealing with construction permits (DB06-15 methodology) - Score

Kosovo
45.47
in 2014
Marshall Islands
92.05
in 2014
Kosovo rank
1st
Marshall Islands rank
1st

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Kosovo
  • Marshall Islands
20406080100200520092014

How they compare

Marshall Islands currently reports 92.05 against 45.47 in Kosovo, a difference of 46.58.

That makes Marshall Islands's figure about 2.0 times Kosovo's.

Across all 6 years both countries report, Marshall Islands has been ahead every year.

Kosovo ranks 1st and Marshall Islands ranks 1st of 1 groups.

Marshall Islands has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Kosovo Marshall Islands Difference Ahead
2000s 14.67 92.93 78.27 Marshall Islands
2010s 28.61 92.76 64.16 Marshall Islands

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Kosovo or Marshall Islands?
Marshall Islands, at 92.05 against 45.47 in Kosovo as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Kosovo and Marshall Islands?
46.58, with Marshall Islands ahead.
How many years of comparable data are there for Kosovo and Marshall Islands?
6 years are reported by both, from 2009 to 2014.
How do Kosovo and Marshall Islands rank globally for dealing with construction permits (db06-15 methodology) - score?
Kosovo ranks 1st and Marshall Islands ranks 1st of 1 groups.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.