Lesotho vs Nicaragua: Dealing with construction permits (DB06-15 methodology) - Score

Lesotho
52.78
in 2014
Nicaragua
52.4
in 2014
Lesotho rank
137th
Nicaragua rank
140th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Lesotho
  • Nicaragua
0204060200520092014

How they compare

Lesotho currently reports 52.78 against 52.4 in Nicaragua, a difference of 0.38.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Nicaragua ahead.

Lesotho ranks 137th and Nicaragua ranks 140th of 181 countries.

Nicaragua has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Lesotho Nicaragua Difference Ahead
2000s 39.19 44.82 5.63 Nicaragua
2010s 46.94 48.2 1.26 Nicaragua

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Lesotho or Nicaragua?
Lesotho, at 52.78 against 52.4 in Nicaragua as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Lesotho and Nicaragua?
0.38, with Lesotho ahead.
How many years of comparable data are there for Lesotho and Nicaragua?
10 years are reported by both, from 2005 to 2014.
How do Lesotho and Nicaragua rank globally for dealing with construction permits (db06-15 methodology) - score?
Lesotho ranks 137th and Nicaragua ranks 140th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.