Lesotho vs Romania: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Lesotho
- Romania
How they compare
Romania currently reports 54.06 against 52.78 in Lesotho, a difference of 1.28.
Across all 10 years both countries report, Romania has been ahead every year.
Lesotho ranks 137th and Romania ranks 134th of 181 countries.
Romania has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Lesotho | Romania | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 39.19 | 62.35 | 23.17 | Romania |
| 2010s | 46.94 | 54.22 | 7.28 | Romania |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Lesotho or Romania?
- Romania, at 54.06 against 52.78 in Lesotho as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Lesotho and Romania?
- 1.28, with Romania ahead.
- How many years of comparable data are there for Lesotho and Romania?
- 10 years are reported by both, from 2005 to 2014.
- How do Lesotho and Romania rank globally for dealing with construction permits (db06-15 methodology) - score?
- Lesotho ranks 137th and Romania ranks 134th of 181 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.