Lithuania vs Malaysia: Dealing with construction permits (DB06-15 methodology) - Score

Lithuania
81.33
in 2014
Malaysia
80.73
in 2014
Lithuania rank
20th
Malaysia rank
23rd

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Lithuania
  • Malaysia
020406080200520092014

How they compare

Lithuania currently reports 81.33 against 80.73 in Malaysia, a difference of 0.6.

Across all 10 years both countries report, Lithuania has been ahead every year.

Lithuania ranks 20th and Malaysia ranks 23rd of 181 countries.

Lithuania has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Lithuania Malaysia Difference Ahead
2000s 75.64 54.39 21.24 Lithuania
2010s 78.75 66.78 11.97 Lithuania

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Lithuania or Malaysia?
Lithuania, at 81.33 against 80.73 in Malaysia as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Lithuania and Malaysia?
0.6, with Lithuania ahead.
How many years of comparable data are there for Lithuania and Malaysia?
10 years are reported by both, from 2005 to 2014.
How do Lithuania and Malaysia rank globally for dealing with construction permits (db06-15 methodology) - score?
Lithuania ranks 20th and Malaysia ranks 23rd of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.