Lithuania vs Morocco: Dealing with construction permits (DB06-15 methodology) - Score

Lithuania
81.33
in 2014
Morocco
81.25
in 2014
Lithuania rank
20th
Morocco rank
21st

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Lithuania
  • Morocco
020406080200520092014

How they compare

Lithuania currently reports 81.33 against 81.25 in Morocco, a difference of 0.08.

The two have swapped places 2 times across 10 shared years of data; in 2005 it was Lithuania ahead.

Lithuania ranks 20th and Morocco ranks 21st of 181 countries.

Across the 2 decades both report, Lithuania averaged higher in 1 and Morocco in 1.

Head to head by decade

Decade Lithuania Morocco Difference Ahead
2000s 75.64 72.14 3.49 Lithuania
2010s 78.75 79.17 0.4211 Morocco

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Lithuania or Morocco?
Lithuania, at 81.33 against 81.25 in Morocco as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Lithuania and Morocco?
0.08, with Lithuania ahead.
How many years of comparable data are there for Lithuania and Morocco?
10 years are reported by both, from 2005 to 2014.
How do Lithuania and Morocco rank globally for dealing with construction permits (db06-15 methodology) - score?
Lithuania ranks 20th and Morocco ranks 21st of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.