Luxembourg vs Samoa: Dealing with construction permits (DB06-15 methodology) - Score

Luxembourg
78.41
in 2014
Samoa
77.95
in 2014
Luxembourg rank
29th
Samoa rank
31st

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Luxembourg
  • Samoa
020406080200520092014

How they compare

Luxembourg currently reports 78.41 against 77.95 in Samoa, a difference of 0.46.

The two have swapped places 2 times across 9 shared years of data; in 2006 it was Luxembourg ahead.

Luxembourg ranks 29th and Samoa ranks 31st of 181 countries.

Across the 2 decades both report, Luxembourg averaged higher in 1 and Samoa in 1.

Head to head by decade

Decade Luxembourg Samoa Difference Ahead
2000s 78.63 78.54 0.0885 Luxembourg
2010s 78.46 78.55 0.0858 Samoa

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Luxembourg or Samoa?
Luxembourg, at 78.41 against 77.95 in Samoa as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Luxembourg and Samoa?
0.46, with Luxembourg ahead.
How many years of comparable data are there for Luxembourg and Samoa?
9 years are reported by both, from 2006 to 2014.
How do Luxembourg and Samoa rank globally for dealing with construction permits (db06-15 methodology) - score?
Luxembourg ranks 29th and Samoa ranks 31st of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.