Malawi vs Uzbekistan: Dealing with construction permits (DB06-15 methodology) - Score

Malawi
50.28
in 2014
Uzbekistan
48.19
in 2014
Malawi rank
147th
Uzbekistan rank
148th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Malawi
  • Uzbekistan
020406080200520092014

How they compare

Malawi currently reports 50.28 against 48.19 in Uzbekistan, a difference of 2.09.

The two have swapped places 2 times across 10 shared years of data; in 2005 it was Malawi ahead.

Malawi ranks 147th and Uzbekistan ranks 148th of 181 countries.

Malawi has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Malawi Uzbekistan Difference Ahead
2000s 75.2 41.39 33.8 Malawi
2010s 63.81 47.51 16.29 Malawi

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Malawi or Uzbekistan?
Malawi, at 50.28 against 48.19 in Uzbekistan as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Malawi and Uzbekistan?
2.09, with Malawi ahead.
How many years of comparable data are there for Malawi and Uzbekistan?
10 years are reported by both, from 2005 to 2014.
How do Malawi and Uzbekistan rank globally for dealing with construction permits (db06-15 methodology) - score?
Malawi ranks 147th and Uzbekistan ranks 148th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.