Republic of Moldova vs Palestine, State of: Dealing with construction permits (DB06-15 methodology) - Score
Dealing with construction permits (DB06-15 methodology) - Score over time
- Republic of Moldova
- Palestine, State of
How they compare
Palestine, State of currently reports 37.36 against 36.27 in Republic of Moldova, a difference of 1.09.
Across all 10 years both countries report, Palestine, State of has been ahead every year.
Republic of Moldova ranks 171st and Palestine, State of ranks 170th of 184 countries.
Palestine, State of has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Republic of Moldova | Palestine, State of | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 28.36 | 37.36 | 9 | Palestine, State of |
| 2010s | 34.79 | 37.36 | 2.57 | Palestine, State of |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits (db06-15 methodology) - score, Republic of Moldova or Palestine, State of?
- Palestine, State of, at 37.36 against 36.27 in Republic of Moldova as of 2014.
- What is the difference in dealing with construction permits (db06-15 methodology) - score between Republic of Moldova and Palestine, State of?
- 1.09, with Palestine, State of ahead.
- How many years of comparable data are there for Republic of Moldova and Palestine, State of?
- 10 years are reported by both, from 2005 to 2014.
- How do Republic of Moldova and Palestine, State of rank globally for dealing with construction permits (db06-15 methodology) - score?
- Republic of Moldova ranks 171st and Palestine, State of ranks 170th of 184 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.