Mongolia vs Portugal: Dealing with construction permits (DB06-15 methodology) - Score

Mongolia
73.19
in 2014
Portugal
72.79
in 2014
Mongolia rank
51st
Portugal rank
52nd

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Mongolia
  • Portugal
020406080200520092014

How they compare

Mongolia currently reports 73.19 against 72.79 in Portugal, a difference of 0.4.

The two have swapped places 2 times across 10 shared years of data; in 2005 it was Mongolia ahead.

Mongolia ranks 51st and Portugal ranks 52nd of 181 countries.

Across the 2 decades both report, Mongolia averaged higher in 1 and Portugal in 1.

Head to head by decade

Decade Mongolia Portugal Difference Ahead
2000s 58.76 51.71 7.05 Mongolia
2010s 67.51 69.95 2.45 Portugal

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Mongolia or Portugal?
Mongolia, at 73.19 against 72.79 in Portugal as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Mongolia and Portugal?
0.4, with Mongolia ahead.
How many years of comparable data are there for Mongolia and Portugal?
10 years are reported by both, from 2005 to 2014.
How do Mongolia and Portugal rank globally for dealing with construction permits (db06-15 methodology) - score?
Mongolia ranks 51st and Portugal ranks 52nd of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.