Mozambique vs Netherlands: Dealing with construction permits (DB06-15 methodology) - Score

Mozambique
70.25
in 2014
Netherlands
70.11
in 2014
Mozambique rank
71st
Netherlands rank
73rd

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Mozambique
  • Netherlands
020406080200520092014

How they compare

Mozambique currently reports 70.25 against 70.11 in Netherlands, a difference of 0.14.

The two have swapped places 1 time across 10 shared years of data; in 2005 it was Netherlands ahead.

Mozambique ranks 71st and Netherlands ranks 73rd of 181 countries.

Netherlands has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Mozambique Netherlands Difference Ahead
2000s 51.33 67.42 16.09 Netherlands
2010s 62.72 68.4 5.68 Netherlands

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Mozambique or Netherlands?
Mozambique, at 70.25 against 70.11 in Netherlands as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Mozambique and Netherlands?
0.14, with Mozambique ahead.
How many years of comparable data are there for Mozambique and Netherlands?
10 years are reported by both, from 2005 to 2014.
How do Mozambique and Netherlands rank globally for dealing with construction permits (db06-15 methodology) - score?
Mozambique ranks 71st and Netherlands ranks 73rd of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.