Namibia vs Poland: Dealing with construction permits (DB06-15 methodology) - Score

Namibia
74.46
in 2014
Poland
74
in 2014
Namibia rank
45th
Poland rank
47th

Dealing with construction permits (DB06-15 methodology) - Score over time

  • Namibia
  • Poland
020406080200520092014

How they compare

Namibia currently reports 74.46 against 74 in Poland, a difference of 0.46.

Across all 10 years both countries report, Namibia has been ahead every year.

Namibia ranks 45th and Poland ranks 47th of 181 countries.

Namibia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Namibia Poland Difference Ahead
2000s 67.47 52.78 14.69 Namibia
2010s 73.35 67.27 6.08 Namibia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits (db06-15 methodology) - score, Namibia or Poland?
Namibia, at 74.46 against 74 in Poland as of 2014.
What is the difference in dealing with construction permits (db06-15 methodology) - score between Namibia and Poland?
0.46, with Namibia ahead.
How many years of comparable data are there for Namibia and Poland?
10 years are reported by both, from 2005 to 2014.
How do Namibia and Poland rank globally for dealing with construction permits (db06-15 methodology) - score?
Namibia ranks 45th and Poland ranks 47th of 181 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits (DB06-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits (DB06-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,813 data points, 2005–2014
Last refreshed

The score for dealing with construction permits is the simple average of the scores for each of the component indicators: the procedures, time, cost to deal with construction permits, as well as the building quality control index that evaluate the quality of building regulations, the strength of quality control and safety mechanisms, liability and insurance regimes and professional certification requirements. The score is computed based on the methodology in the DB06-15 studies.